A2D Mining & Civil
Exploration Drill Line Rehabilitation
Exploration Support

Exploration Drill Line Rehabilitation

FullSite Restoration
CompliantClosure
Multi-siteProgramme
01

Scope

Post-exploration rehabilitation of drill lines, sumps, and access tracks across multiple tenements, returning disturbed areas to an acceptable environmental condition.

03

Approach

Systematically worked through rehabilitation requirements for each drill line and sump. Backfilled sumps, ripped and scarified compacted surfaces, redistributed topsoil, and re-spread seed-bearing material where required.

02

Challenge

Rehabilitating exploration disturbances across large, often remote tenements requires efficient mobilisation and consistent standards. Sites must meet regulatory closure criteria and be left in a stable, non-erosive state.

04

Outcome

Completed rehabilitation of all disturbed exploration areas to required standards, enabling the client to progress tenement closure documentation and meet ongoing regulatory obligations.