Exploration Support
Exploration Drill Pad Construction
Multi-SiteProgramme
CompliantConstruction
RapidTurnaround
01
Scope
Preparation and construction of drill pads for RC and AC exploration drilling, including clearing, levelling, and drainage management.
03
Approach
Deployed a compact earthmoving fleet capable of rapid mobilisation between pad locations. Each pad was constructed to specification including correct dimensions, level surface, and appropriate drainage to manage drill fluid containment.
02
Challenge
Drill pad construction must be completed rapidly to stay ahead of the drilling programme while meeting environmental and safety requirements at each location.
04
Outcome
Delivered all required drill pads to schedule, enabling the exploration drilling programme to proceed without earthworks-related delays across the full programme area.