A2D Mining & Civil
Tailings Dam Capping
Tailings · Bulk Earthworks

Tailings Dam Capping

843,900m³ Moved
28.13Hectares
3mLift Height
01

Scope

Full-scale Tailings Storage Facility (TSF) capping using high-capacity earthmoving equipment and GPS-controlled grading systems.

03

Approach

We utilised our Trimble GPS-equipped fleet to meticulously place capping material across the 28.13-hectare footprint. By linking civil engineering designs direct to our machines, operators functioned with decimeter accuracy, eliminating the need for ground pegs and surveyor delays.

02

Challenge

Managing a large-scale tailings facility requiring high precision capping to ensure environmental compliance and structural integrity, all while working over sensitive material and around active operational infrastructure.

04

Outcome

The project was delivered on time and within budget. We achieved zero environmental incidents, fully contained the tailings footprint, and exceeded all client quality assurance specifications for lift height and compaction.